RANCANGAN PUSH BACK 3 BULAN DI FRONT SUWOTA SITE TANJUNGBULI PT ANEKA TAMBANG UBP NIKEL MALUKU UTARA KABUPATEN HALMAHERA TIMUR PROVINSI MALUKU UTARA

RECKY FERNANDO L., TOBING (2014) RANCANGAN PUSH BACK 3 BULAN DI FRONT SUWOTA SITE TANJUNGBULI PT ANEKA TAMBANG UBP NIKEL MALUKU UTARA KABUPATEN HALMAHERA TIMUR PROVINSI MALUKU UTARA. Other thesis, UPN "VETERAN" YOGYAKARTA.

[img]
Preview
PDF
Download (81Kb) | Preview

    Abstract

    A mine planning design for mining in Tanjungbuli is a long term design, so it is necessary to simplify the entire volume in the overall pit into pit mining units are smaller, so making it easier to handle. Therefore, it is necessary to design a push back for the next 3 months with reference to the principle of conservation of mineral and utilization of minerals to be effectively and efficiently, and look at the deficiencies previously. This can be achieved if the preparation of the plans in accordance with the rules of good mining pratice. Keywords : push back, good mining pratice

    Item Type: Thesis (Other)
    Subjects: 600 Teknologi
    Divisions: Fakultas Teknologi Mineral > Teknik Pertambangan
    Depositing User: Eko Yuli Wahyuningsih
    Date Deposited: 27 Feb 2014 08:56
    Last Modified: 27 Feb 2014 08:56
    URI: http://repository.upnyk.ac.id/id/eprint/8241

    Actions (login required)

    View Item