RECKY FERNANDO L., TOBING (2014) RANCANGAN PUSH BACK 3 BULAN DI FRONT SUWOTA SITE TANJUNGBULI PT ANEKA TAMBANG UBP NIKEL MALUKU UTARA KABUPATEN HALMAHERA TIMUR PROVINSI MALUKU UTARA. Other thesis, UPN "VETERAN" YOGYAKARTA.
Abstract
A mine planning design for mining in Tanjungbuli is a long term design, so it is necessary to simplify the entire volume in the overall pit into pit mining units are smaller, so making it easier to handle. Therefore, it is necessary to design a push back for the next 3 months with reference to the principle of conservation of mineral and utilization of minerals to be effectively and efficiently, and look at the deficiencies previously. This can be achieved if the preparation of the plans in accordance with the rules of good mining pratice. Keywords : push back, good mining pratice